Services - Survey on Connection

During normal drilling operations XPulse automatically transmits and decodes surveys every time a new connection is made with no operator involvement. The survey time for this on jointed pipe application is zero, and only 1 minute for surveys when utilized on a Coiled Tubing Rig.
At Extreme Engineering this is referred to as a NET ZERO effect on drilling operations as no rig downtime is incurred. Other methods to take just one directional wireline survey, including competitor's tools, have historically taken 15-minutes or more.
The time saved from Survey on Connection translates into a more efficient drill operation, because less time saves dollars in your operating budget. In addition more data means more reliable and accurate information.
Simply put, XPulse Survey on Connection is the hands-down leader in the industry when it comes to unmanned directional surveying. Call or
today to get more information about system costs and availability in your area!
Please download our comparative analysis (PDF) to see how using XPulse can save you dollars and cents immediately!
Download our XPulse brochure! (PDF)
Find out what's new with XPulse (PDF)
Efficient. Accurate. Reliable.
|